Your 2050 grid statement

Massachusetts’ local grid has room today: the existing lines the paper reviewed average under 60% loaded. p.36

Scroll to run the clock to 2050, or drag the slider.

Rebuilding every line over capacity in 2020 would add

$0 a month
a month to a typical bill, modeled How?

2021 dollars · one piece of a bill, not the whole bill

By 2050: $6–$30 a month in 2021 dollars, about $13–$62 in 2050 dollars. What is missing from a bill?

Your scenario in 2050 $16 a month
Your upgrades so far $0.0B adds $0 a month by 2050
2020year 11.7GW peak load 2%of lines over capacity (modeled) 3%of customers on them (modeled)
  • Under 60%
  • Nearly full
  • Over capacity
The paper’s two cases
$0.0Bof $27.2B needed
Illustrative network inside the state, not a map of real lines. Read how it was drawn.

The outline of Massachusetts is real. The lines inside it are not the real network: they are generated and placed inside the state, with more substations toward Boston as a design choice. Their loading is drawn to match two figures in the paper: average loading under 60%, and about half of feeders overloaded at double the load (serving 75% of customers). The 2% over capacity in 2020, the shape of the spread between those points, and the years between the paper’s published peak-load figures are my assumptions, which is why those readouts say modeled. Each upgrade is shown at an equal share of the paper’s total, so real costs vary line by line. The figure in the red box is modeled too: it scales the page’s 2050 estimate by the share of lines that need a fix at the year’s load, with electricity sales following the peak-load path to the chosen 2050 level. It is not a year-by-year forecast and it ignores the spending-timing choice further down.

Statement of new grid capacity

Statement date
Oct 21, 2026
Billing period
2026–2050
Account
MA-GRID-2050
Prepared by
Duncan Burns

Illustrative statement. This is not a bill from any utility and not an official estimate. It is an independent analysis built from a published report.

To: a typical Massachusetts household
Using: 600 kWh a month (Eversource R-1 reference)
Re: 2023 EPRI report for the Massachusetts Clean Energy Center

In 2023 the Electric Power Research Institute delivered a white paper to the Massachusetts Clean Energy Center on what the state’s 2050 net-zero law means for the power lines, substations and transformers that carry electricity to homes. On October 21, 2026, CommonWealth Beacon reported that the state has not released it. This page writes the paper’s main estimate out as a bill, line by line, so you can see where each dollar comes from and change the assumptions yourself.

Summary of new charges

your scenario updates as you scroll
Summary of new charges: the paper’s range and your scenario
LineThe paper’s rangeYour scenario
New distribution capacity to build, 2026–2050Substations, feeders and transformers, in 2021 dollars$27B–$46B p.5$27.2B
Yearly cost passed to ratepayers by 2050Depreciation plus a return on what has not been paid off$1.2B–$4.3B model$2.5B
Added to a 600 kWh a month bill in 2050Spread evenly over electricity sold$6–$30 model$16

For scale: the state’s own plan has total electric distribution revenue rising from $2.8 billion in 2020 to $6.3 billion in 2050 for all causes, an increase of $3.5 billion (2020 dollars; paper p.30, note 38). A reference bill today is about $226 a month for 600 kWh (Eversource R-1, Greater Boston, filed rates effective Sept. 1, 2026) verified

Detail of charges: new capacity

Figure 14 p.5 · Tables 3–4 pp.26–28

Each line is a figure from the paper. Move a quantity and the amounts, the running bars, the bill and every chart below re-total. The small tick under each slider marks what the paper assumed.

Detail of charges and credits for new distribution capacity, in billions of 2021 dollars
DescriptionQuantityRateAmountRunning total
Charges
Load-serving capacity p.28Substations, feeders and transformers for new demand from heating, vehicles and everything else
12.2 GW
15.1 GWgrowth plus peaks that do not line up $1.504M/MW $22.84B
Solar hosting capacity p.26Upgrades so new solar can connect to the local grid
21.9 GW
21.9 GW $1.052M/MW $23.04B
Credits the paper applies
Overlap of solar and new demand p.28The same upgrade serves both, so it is only paid for once
50%
50% of solarhosting rate ($11.52B)
Spare capacity already on local lines p.28Room left on existing feeders
20%
20% of loadload rate ($4.57B)
Winter equipment ratings p.28Cold air lets wires and transformers carry more current
10%
10% of 2020 peakload rate ($1.86B)
Flexible load p.28Shifting some demand away from local peaks
20%
20% of 2.5 GWload rate ($0.74B)
Total new capacityPaper: $27.19B with every credit, $45.88B with none (p.5, p.28)$27.19B
More inputs: unit costs and mismatched peaks
$1.504M
$1.052M
24%

The paper observed solar-hosting costs from $0.44M to $1.10M per MW in utility filings (p.26). The 24% comes from feeder data for 2020 (p.10).

Who pays for it

The paper did not assess who pays; it only says developers have historically paid for solar hosting and that regulators are weighing that (pp.29–30). Its low revenue case assumes developers cover half of the hosting cost.

Capital carried by ratepayers in your scenario: $27.2B

How a build becomes a monthly charge

report pp.29–30 · method below

Utilities do not bill for construction. They earn a return on what they invest and recover its cost over decades. Each year’s charge is depreciation plus a return on what has not yet been paid off, plus a small carrying cost. The bars stack each five-year build, so you can see the bill grow as new plant goes in.

Yearly revenue requirement, 2021 dollars

    Rate inputs
    9.35%
    52.8%
    5.0%
    40 yrs
    1.0%
    2.5%

    Massachusetts residential electricity rose about 5.0% a year from 2010 to 2025 (14.6 to 30.4 cents per kWh, EIA series) and about 6.7% a year from 2020 to 2025, against 2.7% a year for the US from 2010 to 2025. That is electricity prices outrunning general inflation; this input sets the general rate. At 2.5% the 2021-to-2050 factor is about 2.0, at 3.5% about 2.7, at 5% about 4.1.

    Timing and dollars

    Meter reading: who shares the cost

    Roadmap Fig. 11 p.43 · EIA Table 2.8

    A yearly charge becomes a bill once it is divided over the electricity sold. Massachusetts sold 49.4 billion kWh in 2024. The state’s 2050 modeling has electrification, mostly heat pumps and electric vehicles, roughly doubling what the grid delivers. Pick a pathway; every cost above is spread over that much electricity.

    Previous reading, 202449,419GWh
    Present reading, 205096,600GWh
    Final electricity demand in 2050, by use

      Delivered electricity is the final demand shown minus 8.3 billion kWh of rooftop solar that never crosses the meter (Roadmap Table 22), over 2024 sales. The 2020 starting level (about 55 TWh) was read off the chart and is not labeled there.

      Amount due in 2050

      your scenario

      Added to a 600 kWh a month bill in 2050

      a month

      For scale: cents per kWh
      Where it lands on a bill

        The red segment is your scenario’s new-capacity charge, about 7% of a reference bill, drawn as its own add-on. The paper prices only distribution-capacity upgrades, and the distribution line is about 26% of a reference bill. It prices nothing else here: not supply, transmission, or the policy line items. It does not assess where on a bill a utility would recover the cost. The add-on is in 2021 dollars set against a bill in current dollars, so the gap in today’s dollars is somewhat larger. Shares come from Eversource’s filed R-1 rates for Greater Boston, effective Sept. 1, 2026, with Basic Service at 17.323¢ a kWh, for a 600 kWh month: one utility’s Boston-area bill, not a statewide average. verified

        Where your scenario sits among every combination
        • Full return on 2021-dollar plant
        • Inflation-adjusted return
        • Your scenario

        Each dot is one of 18 combinations: the paper’s three cases, the three demand pathways, and the two inflation treatments, with your rate inputs held. The bill is for 600 kWh a month, spread evenly per kWh. Real rate design assigns costs by customer class, and the paper did not assess that.

        What moves the total

        new-capacity total, $ billions

        Each bar shows the total if that one input sits at its low or high end while everything else stays where you set it. A solid bar is a range the paper itself reports. An outlined bar is my judgment, because the paper gives a single value. The red line is your total.

        Sensitivity of the new-capacity total
        • Range from the paper
        • Range chosen by me
        • Your total

        Not on this statement

        read before quoting any number
        • Everything already on a bill. Supply, existing delivery and transmission charges, and policy charges are not here. This is only the added cost of new local-grid capacity.
        • Transmission and other grid costs. The paper prices local distribution capacity only. It says transmission upgrades will also be needed, and leaves out operating and maintenance costs, storm costs, replacing aging equipment and grid modernization (pp.25–26, 33).
        • What is already in budgets. The paper did not check how much of its estimate utilities already plan to spend (p.29).
        • Who pays. The paper did not assess cost allocation; regulators were weighing it (pp.29–30). Its current status is not checked here.
        • Customer classes. Costs are spread evenly per kWh. Real rate design is not.
        • Your actual use. Usage is held at 600 kWh a month. Homes that electrify use more electricity and less oil, gas or gasoline, so this is the added electric charge, not a household’s net energy cost.
        • The dollar year. The paper is in 2021 dollars. Today’s bills are in current dollars.
        • Hourly data. The paper’s load charts are images and no hourly series were published, so none are drawn here.
        • The demand base. The paper used the state’s 2025/2030 plan scenario, whose published table stops at 2030. Demand for 2050 here comes from the 2020 Roadmap modeling.

        Billing history of this report

        dates as reported
        Timeline of the report with the source for each entry
        WhenWhat happened
        2021The Massachusetts Clean Energy Center agrees a $379,000 contract with EPRI for three workshops and a white paper.Source: MassCEC program page, as cited by CommonWealth Beacon
        Spring 2022Three stakeholder workshops with the two largest utilities, state agencies and others.Source: EPRI paper, p.2
        2023EPRI submits the white paper and is paid in full.Source: EPRI spokesperson, per CommonWealth Beacon
        Sep 1, 2023Date by which the paper says utilities’ longer-range grid plans would be submitted for review (written in the future tense).Source: EPRI paper, p.6
        Oct 21, 2026CommonWealth Beacon reports it obtained a copy and that the state has not released it. MassCEC does not dispute the copy’s authenticity and says other state processes shifted the focus to utility planning.Source: CommonWealth Beacon; MassCEC spokesperson statement

        Receipts: rebuilt against the paper

        computed live from the page’s model

        The test of an independent estimate is whether it reproduces the original first. These are the paper’s figures next to this page’s, at the paper’s own settings.

        The paper’s figures against this page’s rebuild
        ItemPaperRebuiltResult

        Method and sources

        every input, with its status

        Capital lines scale the paper’s published bars, so the defaults match it exactly. A revenue requirement is built year by year: each year’s spend enters service at once, depreciates in a straight line, and earns a pre-tax return on average net plant, plus a carrying cost. Deferred taxes are ignored, which overstates slightly. Bill = revenue requirement ÷ delivered kWh, for a 600 kWh household.

        Inputs, their values and verification status
        InputValueStatus
        Unit costs, quantities, Figure 14 bars$1.052M and $1.504M per MW; 21.9, 12.2, 2.9 GWfrom the paper pp.5, 26, 28
        Return on equity, equity share9.35%, 52.83%verified for National Grid’s Massachusetts Electric (D.P.U. 23-150, Oct 2024). Eversource’s NSTAR Electric, whose bill is the reference here, was authorized 9.80% in D.P.U. 22-22 (Nov. 30, 2022; the company proposed a 53.21% equity share, which the order does not dispute). Using 9.80% and 53.21% would raise the headline estimate by about 2.6%, roughly 40¢ a month.
        Cost of debt, tax rate, plant life, carrying cost5%, 27.3%, 40 yrs, 1%judgment tax is the 21% federal and 8% state statutory rates
        2024 retail sales49.419 TWhverified EIA Table 2.8
        2050 demand and rooftop solar92.3 / 104.9 / 123.6 TWh; 8.3 TWhfrom the Roadmap Figure 11 p.43 (labels), Table 22; 2020 base read off chart
        Reference bill, distribution charge, average rate$225.75; 9.84¢; 30.49¢verified the bill and the distribution charge, against Eversource’s filed R-1 rates effective Sept. 1, 2026 and its Basic Service price (17.323¢). The 30.49¢ average is EIA’s preliminary July 2026 figure for Massachusetts homes (Electric Power Monthly, Table 5.6.A), checked against EIA
        Inflation for 2050 dollars and the inflation-adjusted return2.5% a year, adjustable 1.5% to 6%judgment MA electricity prices rose about 5.0% a year over 2010–2025: 14.59¢ to 30.41¢ a kWh in EIA’s Electric Power Annual (final values), checked against EIA

        Sources

        1. EPRI white paper for the Massachusetts Clean Energy Center, 2023, 36 pages. The copy CommonWealth Beacon obtained: linkjar.to/1a1f17fd
        2. CommonWealth Beacon, “Mass. spent nearly $400K on an energy study. Three years after its completion, the state hasn’t released the results,” Oct 21, 2026: commonwealthbeacon.org
        3. Massachusetts 2050 Decarbonization Roadmap, Energy Pathways technical report (Figure 11 p.43; Table 22): mass.gov
        4. Clean Energy and Climate Plan for 2025 and 2030, appendices (table E.4): mass.gov
        5. U.S. Energy Information Administration, Table 2.8, sales to ultimate customers by state: eia.gov
        6. National Grid, Massachusetts Electric 2024 rate case order (return on equity, equity ratio): sec.gov

        Remittance

        Nothing to pay. This stub holds your scenario: copy the link and whoever opens it sees exactly what you set. The code line below is the same scenario written out.